Scope
Our scope included workshop detail drawings, fabrication, protective coatings and erection of 4 structural steel buildings for a vehicle wash point facility.
The works comprised a 30 tonne structural steel package with 280m2 of floor grating, 250m of Hand railing, purlins and girts.
Value: $375,000
Completion: February 2018